SOUTHWEST OHIO REGIONAL TRANSIT AUTHORITY
Invitation for Bids 30-2017
IBM Maximo Maintenance
 SORTA requests bids for the renewal of IBM Maximo Maintenance and Support. Bidding instructions, specifications, and contractual terms and conditions may be obtained by contacting SORTA’s Procurement Department, Lyndi Whiteker at 513-632-9229 or [email protected].
Cincinnati, Ohio. May 25, 2017.
May 25 Jun 1
 
LEGAL NOTICE
—————
REQUEST FOR QUALIFICATIONS
Construction Phase Services for the Mill Creek Wastewater Treatment Plant Dewatering Polymer System Replacement  
RFQ # 2017-016
SEALED PROPOSALS will be received for the Metropolitan Sewer District of Greater Cincinnati (“MSDGC”) by the City of Cincinnati (the “City”), as sole management agency for the operation and maintenance of MSDGC at Two Centennial Plaza, 805 Central Avenue, Suite 234, Cincinnati, Ohio 45202:
UNTIL 1:30 PM on Tuesday,
June 6, 2017
Offerors must deliver their proposals to the City at Two Centennial Plaza, 805 Central Ave, Suite 234, Cincinnati, Ohio 45202, by the time and date specified above, either by hand or other logistics.
As of 5/22/17, interested parties may download RFQ Documents from the Open Data Cincinnati website and should frequently return to the site to monitor for project-specific updates and addenda.  https://data.cincinnati-oh.gov    (Once there, simply click on the piggybank icon and then select “Procurement Opportunities and Contract Awards”)
Questions on this project or any part of the RFQ Documents must be sent via e-mail to [email protected] by the established deadline. The deadline for questions is 1:30 PM local time on Tuesday, May 30, 2017.       
A brief description of the services sought:
The current dewatering polymer system is located within the Dewatering Building and is comprised of bulk polymer storage tanks which were installed with the building in the late 1950’s, and a polymer make-down and feed system that was installed in the 1990’s. With the storage tanks well beyond their useful service life, and over 15 years of polymer make-down system operation (the last 5+ years of which have occurred without manufacturer supported replacement parts), the entire polymer system has been and continues to be in need of replacement. The objective of this project is to provide a polymer dewatering system that is reliable and well supported.
Design of this project was completed in February 2013 and subsequently updated in September 2015. The basis of design memorandum is included as part of this RFQ. This project is located at the Mill Creek WWTP, 1600 Gest Street, in the City of Cincinnati, Hamilton County, Ohio.
Cincinnati, Ohio. May 25, 2017.
 